هيكل غشائي للملعب علامة تجارية رائدة في الصناعة
خط الأعمال:

+86 13028953357

الرئيسية نبذة عن وانهاو مشاريع وانهاو اتصل بنا

بحث

الرئيسية / أخبار / وانهاونيوز

The steel structure of the construction project of Sichuan Gaoxing Coal Reserve Base is coming to an end, and the installation of the membrane structure begins

Mar. 07, 2022
مشاركة

The construction project of Sichuan Gaoxing Coal Reserve Base is located in Gaoxing Logistics Zone, south of Gaoxing Railway Station, Huaying City, Sichuan Province. The membrane structure of the project covers an area of 120,000 square meters and was constructed by Ningbo Wanhao Space Structure Engineering Co., Ltd.

At present, the steel structure of the project is coming to an end, and the membrane structure has begun to be installed.

微信图片_202203070813151.jpg

微信图片_20220307081315.jpg

微信图片_20220307082810.jpg

微信图片_202203070828101.jpg

微信图片_202203070813152.jpg

Looking forward to the completion of the entire project, to appreciate its unique style.

الرئيسية نبذة عن وانهاوETFEPTFEهيكل فولاذي فضائيمشاريع وانهاوقيد الإنشاءأخباراتصل بنا
  • هاتف التفاوض التجاري: +86 130 2895 3357
  • البريد الإلكتروني: sales@whmembrane.com
  • خط الخدمة: +86 574 2886 7851, +86 18658257258
  • العنوان: رقم 20، ج (عمل جيد) الطريق الثالث، شانغ ومنطقة التنمية الاقتصادية والتكنولوجية، شانغ والمنطقة، س (الخط)، ز (وجيانغ)، الصين

حقوق النشر © هيكل غشائي للملعب جميع الحقوق محفوظة.   

خريطة الموقع | الدعم الفني   

إرسال رسالة
الأعلى